This note defines the minimum release conditions PrivateDAO should satisfy before any mainnet cutover is treated as acceptable.

It is intentionally strict.

Required Before Mainnet

  • External audit findings must be reviewed and closed to an acceptable residual-risk level.
  • Upgrade authority must be controlled by an explicit multisig or governance-owned authority path.
  • Production monitoring, alert routing, and incident ownership must be assigned and tested.
  • Release artifacts, proof surfaces, and generated attestations must all pass `npm run verify:all`.
  • Wallet runtime checks must be exercised against real client environments, not only repository-side verification.
  • The canonical place to track that work is `docs/runtime/real-device.generated.md`, backed by `docs/runtime/real-device-captures.json`.
  • Treasury handling, operator responsibilities, and rollback or pause procedures must be documented and rehearsed.

Blocking Conditions

Do not call the system mainnet-ready if any of the following remain true:

  • `externalAudit` is still `pending`
  • `mainnetRollout` is still `pending`
  • strategy execution and live-performance surfaces remain outside repository scope
  • runtime wallet behavior has not been validated in real signer environments
  • generated review artifacts or cryptographic manifests are stale

Internal Pass Conditions

The repository-side readiness surface is considered internally strong when all of the following hold:

  • governance lifecycle is verified
  • additive governance and settlement hardening V3 paths are Devnet-proven
  • security reasoning is verified
  • zk companion stack is verified
  • reviewer surface is verified
  • operations surface is verified
  • proof registry, release manifest, readiness report, and deployment attestation remain consistent

Canonical Commands

npm run build:mainnet-readiness-report
npm run build:deployment-attestation
npm run build:go-live-attestation
npm run verify:mainnet-readiness-report
npm run verify:deployment-attestation
npm run verify:go-live-attestation
npm run verify:all

Decision Rule

PrivateDAO should only be described as ready for mainnet cutover when:

  • all internal repository checks pass
  • no blocking condition remains
  • the external operational dependencies are completed in reality, not only documented

Until then, the correct state is:

  • internally hardened
  • reviewable
  • devnet-proven
  • not yet cleared for mainnet cutover